Seyitömer Thermal Power Plant
Project Overview
Performed by REENTEC Energy Seyitömer Thermal Power Plant as part of the project carried out at the facility, Electrostatic Precipitator (ESP) Upgrade was successfully completed.
During the project, the electrical and automation infrastructure of the existing Electrostatic Precipitator (ESP) system was upgraded, the control systems were modernized, and the integration of field equipment was successfully completed. The upgrade works enhanced overall system performance, improved operational reliability, and contributed to the power plant's environmental emission control processes. All works were carried out within the planned maintenance program and completed in full compliance with international quality standards and occupational health and safety regulations.
Scope of Work
- Electrostatic Precipitator (ESP) System Upgrade
- Electrical Infrastructure Upgrade
- Control and Automation System Modernization
- Field Cabling and Equipment Connections
- MCC and Control Panel Upgrade
- I/O Verification and Signal Validation
- Loop Checks and Functional Testing
- Commissioning and Performance Testing
- Technical Documentation and System Handover