Polat Elektrik Termik Santral

Date2023
LocationTurkey
ClientPolat Elektrik
Scope of Work:Thermal Power Plant Automation Systems / DCS Modernization / Industrial Control Systems

Project Overview

Performed by REENTEC Energy Polat Elektrik Thermal Power Plant as part of the project carried out at the Distributed Control System (DCS) altyapısının Full-Scope Modernization was successfully completed.

Throughout the project, the existing automation systems were modernized, the control infrastructure was upgraded, and the DCS integration of field equipment was successfully completed, enhancing the overall reliability of the system. All modernization activities were carried out during planned shutdown periods to ensure the uninterrupted operational continuity of the power plant. Upon completion of the project, all testing, commissioning, and system verification activities were successfully finalized in accordance with applicable engineering standards.

Scope of Work

  • Full-Scope DCS Modernization
  • DCS Hardware and Software Upgrades
  • DCS Integration of Field Instruments
  • I/O Verification and Signal Validation
  • Loop Checks and Functional Testing
  • SCADA/DCS Communication Verification
  • Commissioning and Performance Testing
  • Technical Documentation and System Handover