ORAN Polyester
Project Overview
Performed by REENTEC Energy Oran Polyester as part of the project carried out at the manufacturing facility, the installation of the electrical systems required to ensure the safe and uninterrupted operation of the facility's power infrastructure was successfully completed.
The project scope included the installation of power distribution panels, LV power cabling, equipment connections, field installation works, and commissioning activities, all carried out with meticulous attention to detail. The project was completed in accordance with international quality standards and occupational health and safety regulations to support the continuity of the production processes, providing the facility with a safe, reliable, and efficient power infrastructure.

